3.32 BACKFILL REQUIREMENTS

Print this page
View page as PDF

Backfilling Requirements

Do not backfill a basement wall until –

  • Concrete has cured at least 7 days
  • Support for top of wall has been installed
  • Flooring system is in place and anchored to wall
  • Waterproofing materials installed
  • Footing drainage line installed
  • Backfill material should be free of construction debris, sharp objects, and large rocks
  • Backfilling protective material is recommended to protect water proofing